August 2008 - Defense Estates Contract Value..in excess of £300,000
Carter Cabin Hire supplied and installed 22 no.7.2m x 3.0m bays of bespoke climate controlled modular buildings.We also supplied and installed jack pad foundations. This environmentally friendly alternative to concrete foundations will facilitate the potential relocation of the building at a later date.
The installation was hindered by the awkward layout of the site and time restrictions. This meant the pads had to be laid in advance. This proved to be but a minor inconvienience to our experienced crew who skilfully guided our crane vehicle between the rows.Utilizing the 360` traverse of the massive 80ton/metre crane, each bay was gently lowered into position without even brushing the surrounding trees.
Site Manager Don said “ On time, on budget.. job well done”


|